The work, room by room.

Residences, healthcare, hospitality and experience spaces. Shown without client names or locations, each labelled by its real stage.

Experience centre and private cinema, design visualisation8 images

Experience centre and private cinema

An experience centre that opens with a parametric reception and entrance lobby, then moves guests through lounges with sculpted ceilings to a star-ceiling cinema.

Concept and visualisation

Executive office interior, design visualisation7 images

Executive office interior

An executive office where the reception, boardroom, lounge and workspaces read as one calm sequence of light and dark surfaces.

Completed

Signature bedroom and dressing suite, design visualisation3 images

Signature bedroom and dressing suite

A bedroom suite built around a sculpted headboard wall of crossing light lines, with a detailed dressing room and a ribbed ceiling.

Concept and visualisation

Residence interior fit-out, design visualisation6 images

Residence interior fit-out

Design, full-space planning and manufacturing coordination for a contemporary residence interior.

Completed

Business hotel concept, design visualisation

Business hotel concept

A curved glass tower with a palm-lined forecourt, imagined as a business hotel arrival experience.

Concept

Angular commercial building concept, design visualisation2 images

Angular commercial building concept

A two-storey commercial building with angled concrete planes, full-height glazing and a planted roof terrace.

Concept visualisation

Healthcare interior, design visualisation4 images

Healthcare interior

A calmer, brighter patient journey for an institutional healthcare facility, from reception to the wards.

Concept and design oversight

Terraced family residence, design visualisation8 images

Terraced family residence

A terraced home stepped down its site, with courtyards, pool terraces, a show garage and a gallery hall.

Concept and visualisation

Residence and flythrough, illustration

Residence and flythrough

A planning-stage residence presented through a full flythrough, so the client could walk the house before it was drawn up for building.

Planning stage

Phased institutional upgrade, illustration

Phased institutional upgrade

An upgrade planned in phases around a facility that had to keep working throughout.

Proposal

From drawing to build, illustration

From drawing to build

How a hand drawing becomes a measured, buildable plan that a workshop can price.

Technical drawings

Material and mood library, design visualisation

Material and mood library

A working library of materials and moods that feeds every Material Board session.

Ongoing

Grey images are illustrations of the stage of work, not photographs of the project. Design by a Dev 360 Associate.

Let's talk about your space.

Share what you are planning. We discuss the brief with you personally before anything is quoted.

Discuss your space