A considered process, with approvals along the way

We begin with a conversation about the space and what it needs to do. After agreeing a brief and scope, a Dev 360 Associate develops the design for client review. Visualisation and coordination are included only where agreed. Client approvals guide each next step.

From first conversation to coordination

  1. 1

    Share your vision

    Tell us about the space, its users, what needs to change and what a good result must support.

  2. 2

    Agree the brief

    We review plans and available information, clarify priorities and confirm scope, fee and timing before work begins.

  3. 3

    Design development

    A Dev 360 Associate develops the layout and design direction within the agreed deliverables.

  4. 4

    Review and approve

    The client reviews options, provides consolidated comments and approves the direction before dependent work proceeds.

  5. 5

    Visualise

    Renders or a walkthrough are prepared where included in the agreed package or quoted separately.

  6. 6

    Coordinate

    Where appointed, Dev 360 coordinates with the client’s contractors and workshops. Contractors remain responsible for construction.

What the client contributes

Useful inputs include current plans, photographs, approximate area, relevant dimensions, user needs, known site constraints and a decision-maker who can provide approvals. Tell us which aspects are fixed and which are open to design. Where existing measurements need checking, we can discuss a site measure. The client should also identify any contractors or workshops already appointed and share their relevant information when appropriate.

Keep reviews clear

A review is most useful when comments are collected in one place and linked to the option or view being discussed. Separate must-haves from preferences and identify who has authority to approve. If feedback changes the brief or approved direction, we discuss the effect on scope, fee and timing before proceeding. No client approval is assumed from silence.

Timelines depend on the brief

There is no single timeline that fits every space. Area, available information, complexity, review turnaround and the selected deliverables affect the work. We agree the programme for each brief before the design starts, including what the client needs to provide and when approvals are expected. Changes or late information may require an updated agreement.

Design is not construction

The process develops design information and can include agreed coordination with the client’s providers. It does not transfer the builder’s, workshop’s or installer’s duties to Design Studio. The client contracts directly with those providers and confirms their pricing, technical proposals, health and safety arrangements and construction programme.

Questions

When does the timeline start?

The project timeline is agreed for each brief. Before work begins, confirm the scope, starting information, review points, client inputs and approval responsibilities.

Who approves design decisions?

The client identifies the decision-maker and approves design directions, finishes and changes. We record approvals and clarify the effect of requested changes before proceeding.

Can I involve my contractor early?

Yes. Share the contractor’s relevant requirements where available. The client’s contractor remains responsible for construction information, technical checks and execution.

What if I change the brief?

We discuss changes and their effect on deliverables, fees and timing before carrying them out. A revised scope should be agreed in writing.