A clear starting point for the brief

The package list gives starting points for common design scopes. Prices are shown excluding VAT and use the units stated. We confirm the project area, deliverables and scope before quoting. Work outside an agreed package is discussed before it proceeds.

Approved packages, prices excluding VAT

Each listed package has defined inclusions. We confirm project fit and scope before quoting.

Concept Pack

R14,500, per space up to 40 m². Includes: Brief and plan review; Two layout options; Material Board; One render.

Space Plan and Finishes Schedule

R420 / m², minimum R35,000. Includes: Full-space plan; Coded finishes schedule (FN-01 onwards); Lighting layers; Two renders.

Show Unit or Experience Centre

R650 / m², minimum R85,000. Includes: Visitor journey; Finishes and options display; Four renders; Coordination meetings.

Sales Centre Premium

from R165,000, per project. Includes: Full narrative and procurement schedule; 6 to 12 renders; 30-second walkthrough; Fit-out coordination.

Choose by the decision you need to make

The Concept Pack suits an early defined space up to 40 m² and includes two layout options, a Material Board and one render. The Space Plan and Finishes Schedule package is measured by area and includes a full-space plan, coded finishes schedule, lighting layers and two renders. A Show Unit or Experience Centre package focuses on the visitor journey and options display. Sales Centre Premium includes a fuller narrative, procurement schedule, a specified render range, walkthrough and fit-out coordination.

Add-ons

Add-ons are separate from package prices unless a written scope says otherwise.

Extra render

R4,950 per view

30-second walkthrough

R38,000

Site measure

R3,500 plus travel

Fit-out coordination

8% of fit-out value, minimum R25,000

Procurement handling

Cost plus 10%, by written agreement

Material Board session

R2,950, credited against a Concept Pack

Scope and quote

Prices shown are excluding VAT. The stated unit and minimum apply as written, but the final fit depends on the project brief and measured area. We confirm the deliverables, assumptions, dependencies, client approvals and any add-on before quoting. Procurement handling is only by written agreement. Contractors, workshops and other suppliers are appointed by the client; their construction, supply and installation costs are not included in a design package.

What to share

Send the type and approximate size of space, current plan or photographs, the outcomes you need and any known timing or site constraints. We can then discuss which package is relevant and whether extra measurement or visualisation is needed. A quote follows a scope conversation, so you can see what the fee covers before deciding whether to proceed.

Questions

Are package prices inclusive of VAT?

No. All package prices and add-on prices shown on this page are excluding VAT.

Does the listed price confirm my total project fee?

No. The package price is a reference for its listed scope and unit. We confirm the brief, area, inclusions and any additions before quoting.

Can I add more renders or a walkthrough?

Yes, the listed add-ons include an extra render at R4,950 per view and a 30-second walkthrough at R38,000. We confirm the scope before quoting.

Does the package include construction?

No. Packages are design and stated coordination deliverables. The client appoints and contracts with the contractors and workshops who carry out construction.

Let's talk about your space.

Share what you are planning. We discuss the brief with you personally before anything is quoted.

Discuss your space