Choose finishes with a schedule to match

The Material Board is a working design tool for considering finishes together and recording where selected materials belong. A coded finishes schedule makes those choices easier to discuss with contractors and workshops. It supports design coordination, but does not replace physical samples, supplier confirmation or construction specifications.

Compare relationships, not isolated swatches

A finish changes how nearby materials read. Compare the floor with joinery, the wall treatment with lighting and high-touch surfaces with the way people use the room. Consider where a surface appears, how much area it covers and whether a strong feature is repeated too often. A board can help test a restrained palette before choices are applied across a larger space.

Give each selection a place

The schedule should identify a code, finish description and intended location. That link helps a client, Associate and workshop discuss the same item. Where alternatives are still under review, mark them as options rather than approved selections. Include enough context for a contractor to raise questions, while avoiding claims that a short description replaces a manufacturer’s technical data or a full specification.

Treat samples as evidence

Screens and printed boards cannot reliably establish exact colour, texture, sheen or batch variation. Review physical samples in the intended lighting and alongside neighbouring finishes. Confirm availability, lead times, cleaning requirements, suitability and installation advice with the relevant supplier or contractor. If a proposed substitution is needed, compare it against the design intent and obtain the client’s approval before updating the schedule.

Book a session or include the board in scope

A Material Board session is R2,950, credited against a Concept Pack, excluding VAT. The Concept Pack includes a Material Board. A larger measured package includes a coded finishes schedule. We confirm the project’s area, decisions and deliverables before quoting. Bring a plan, photographs, sample references and any known maintenance or durability requirements.

Show unit board

4 of 5 finishes

CodeFinishUse
Smoked oak veneerJoinery and wall panels
Honed travertineFloors and vanity tops
Brushed brassTrims and ironmongery
Natural linenCurtains and upholstery
Discuss this board

Questions

Is the Material Board a final specification?

It is a working design tool. The coded schedule records selected finishes and locations, while supplier data, physical samples, technical suitability and installation requirements must be checked for the project.

What is the session price?

A Material Board session is R2,950, credited against a Concept Pack, excluding VAT. The scope and credit arrangement are confirmed before booking.

Can a workshop build directly from the board?

The board helps communicate finish intent, and a coded schedule gives more structured information. Contractors and workshops must check dimensions, product availability and technical requirements before fabrication or installation.

What should I bring?

Bring available plans, photographs, finish references, information about use and maintenance, and any samples already selected. If choices are fixed or must meet a specific requirement, list those clearly.

Let's talk about your space.

Share what you are planning. We discuss the brief with you personally before anything is quoted.

Discuss your space