Residential · Concept and visualisation
Terraced family residence
A terraced home stepped down its site, with courtyards, pool terraces, a show garage and a gallery hall.
In short
Terraced family residence is a residential project at the concept and visualisation stage, designed by a Dev 360 Associate. Every level opens to its own outdoor room, so the house reads as a series of terraces rather than one large block. Client names and locations are kept private.

What the work covered
- Concept development across every level
- Indoor and outdoor living planned as one sequence
- A gallery hall and show garage as signature spaces
- A full set of visualisations and a walkthrough
The idea
Every level opens to its own outdoor room, so the house reads as a series of terraces rather than one large block.
Questions
Who designed this project?
The design is by a Dev 360 Associate. Design Studio brings that work to clients and runs the conversation with you.
Can I see more of this project?
Some detail stays private to protect the client. Ask us and we will share what the client has agreed can be shown.
Let's talk about your space.
Share what you are planning. We discuss the brief with you personally before anything is quoted.
