Straight answers before you brief a space

Here are practical answers to common questions about working with Design Studio. We confirm scope and timing for each brief. Project rights are agreed in writing, and construction remains the responsibility of the client’s appointed providers.

Start with the decisions that matter

A first conversation can establish whether you need an early concept, a full-space plan, a finishes schedule, visualisation or help coordinating with providers. Bring available plans, photographs, approximate area and a short list of priorities. If no drawing exists, explain what information you have so we can decide whether measurement should be included.

Agree the scope and responsibilities

The package prices are excluding VAT and scope is confirmed before quoting. Timelines are agreed per brief, with client inputs and review points made clear. A Dev 360 Associate does the design. Design Studio offers design and agreed coordination, not construction. The client appoints contractors and workshops and confirms their technical and commercial proposals.

Keep rights and approvals in writing

The client approves design choices and any changes to the brief. Ownership and use of drawings and visuals should be agreed in writing per project, including any intended marketing use. A project is displayed only with release, without client names or locations and with a concept, proposal or completed stage label.

Questions

Who does the design?

All design is credited only to a Dev 360 Associate. Design Studio is part of Dev 360, which manages the client relationship and may coordinate with the client’s contractors and workshops.

Who owns the drawings and visuals?

Ownership and permitted use of drawings and visuals should be agreed in writing for each project. The appointment should identify what may be used, by whom, for which purpose and whether credit or limits apply.

How long does a project take?

Timelines are agreed per brief. The scope conversation should cover information needed, design stages, client review periods, approvals and any dependencies on contractors or suppliers.

What should I bring to the first conversation?

Share a plan if you have one, photographs, approximate floor area, the space’s users and uses, key priorities, known constraints and any decisions already made. It is helpful to say what remains open.

Do you measure the site?

A site measure is available as a listed add-on at R3,500 plus travel, excluding VAT. We confirm whether measurement is needed and what area it covers before quoting.

What is the difference between a render and a walkthrough?

A render is a still view for examining a selected angle. A walkthrough communicates movement through a sequence. Both represent a proposed design and do not replace plans, samples or technical information.

Do you build, fabricate or install?

No. Construction itself is not offered. The client appoints contractors, workshops and installers. Design Studio may coordinate with those providers when included in a written scope.

Are prices inclusive of VAT?

No. Package and add-on prices shown are excluding VAT. We confirm the project scope and quote before work begins.

Can I request changes after a design review?

Yes. The client can give feedback at agreed review points. If a change affects the approved brief or deliverables, we discuss the scope, fee and timeline before proceeding.

Can I use a render to choose an exact colour?

Use a physical sample and supplier information for exact material decisions. A render represents a finish and lighting direction; screens and image conditions can alter the appearance.

Can you coordinate with my workshop?

Yes, if coordination is part of the agreed scope. The workshop remains responsible for its fabrication, technical checks and installation. The client approves commercial and construction decisions.

Will you publish my project?

Only with the required release. Names and locations stay private, stage labels are used, and design is credited only to a Dev 360 Associate.

Let's talk about your space.

Share what you are planning. We discuss the brief with you personally before anything is quoted.

Discuss your space